Christmas Lights: Difference between revisions
Appearance
Created page with "We arrange with a local lights company to install and take down the lights. There are 20 lights in total, with 19 in Sittingbourne High Street and 1 in the adjoining Central Avenue. ===Permissions Required=== {| class="wikitable" |+ Permissions Required |- ! Item !! Obtain From !! Typical cost !! Description |- | Streetlight attachment permit || Kent County Council || £41 || Technically needed at least 6 weeks before the lights are put up (not the switch on date) |}" |
m Gareth moved page Lights Installation to Christmas Lights |
(No difference)
| |
Revision as of 14:48, 21 September 2025
We arrange with a local lights company to install and take down the lights.
There are 20 lights in total, with 19 in Sittingbourne High Street and 1 in the adjoining Central Avenue.
Permissions Required
| Item | Obtain From | Typical cost | Description |
|---|---|---|---|
| Streetlight attachment permit | Kent County Council | £41 | Technically needed at least 6 weeks before the lights are put up (not the switch on date) |